Transforming Africa’s Infrastructure Vision

into Investment-Ready Reality

NEPAD-IPPF

in the Project Preparation life-cycle

STAGE 1: PROJECT INCEPTION
STAGE 1: PROJECT INCEPTION

Scoping of the project idea within the context of enabling environment and project need. Typically includes the following activities:

• Enabling legislation and political support

• Regulatory and policy environment and alignment

• Capability of key state institutions or state-owned entities

• Project scale, technology and need

• Key dependencies and fatal flaws

• Prioritising project against other initiatives competing for resources

• Identifying project outputs and project champions

• Basic affordability

STAGE 2: PRE-FEASIBILITY
STAGE 2: PRE-FEASIBILITY

The high-level design with studies to determine the optimal project approach. Includes the following activities:

• Defining the available technical options with respective risk profiles

• Identifying desired project outputs and project parameters

• Comparison against alternatives with direct and indirect benefits defined

• Preliminary life-cycle costing

• Undertaking formal pre-feasibility studies

• Procurement strategy

• Alignment with and building on the project inception activities

• Preparing action plans and terms of reference

STAGE 3: BANKABLE FEASIBILITY
STAGE 3: BANKABLE FEASIBILITY

The detailed project analysis required to determine the technical and financial viability to a level that would give an accurate view of project design and likelihood of raising finance through a combination of equity and debt. Includes the following activities:

• Technical design and key project planning

• Financial appraisal

• Socio-economic and environmental impact assessments

• Contracting terms and conditions

• Assessing finance options ( public, private, PPP)

• Legal and regulatory design

• Procurement terms

STAGE 4: FINANCIAL CLOSE
STAGE 4: FINANCIAL CLOSE

Involves procurement and financing which demand the following activities:

• Finalising of a legal structure

• Finalising technical designs

• Finalising procurement and contracting

• Achieving Financial Close

STAGE 5: EXECUTION
STAGE 5: EXECUTION

Moves the project into the chosen contracting mode where the engineering, procurement and construction activities are undertaken. This phase invariably leaves the project owner in the role of monitoring and evaluating performance against the chosen contracting methodology.

This stage is beyond the scope of NEPAD-IPPF’s intervention. However, capacity-building activities for project cycle support ensure the creation of a sustainable enabling environment for infrastructure development and private sector participation. Capacity-building contributes to the successful execution of projects prepared by NEPAD-IPPF.